Reviewed by 20X · No signed release verified
- Works with (as stated by the author)
- Cursor
Review details
- Human review
- Review recorded for these files
- Limited checks
- Limited checks recorded (v2.1.0)
- Source
- Source not verified
A verified signature checks published file bytes against a trusted publisher’s signed manifest. It does not verify safety, authorship, rights or assistant use.
Declarations and limited checks do not guarantee safety or sharing rights. Review the files before use. Access that the author has not stated is unknown.
How to use it
- 1Download the skill folder and keep its files together.
- 2Put the folder in your agent's skills directory (for Claude Code: ~/.claude/skills/ or .claude/skills/ in a project), or upload it as a skill in the Claude app.
- 3Start a new session so the skill is picked up.
- 4Type /figure-it-out and describe the large change.
Community results
0 reportsNo one has shared a result yet.
1 file. Filenames and raw files are in Technical details.
name: figure-it-out description: "Design an auditable playbook when no narrower one fits: a large migration, an ambitious multi-part change, or work a human reviews after stepping away. Scales rigor to the task, runs a hypothesis loop, and logs decisions via show-me-your-work. Use for /figure-it-out, 'figure it out', a large migration, or when no narrower playbook applies." disable-model-invocation: true
Figure it out
When the task matches no playbook, design one. The deliverable before any code is the workflow itself: a sequence of phases that scales rigor to the task, runs the scientific method, and leaves a decision trail a human can audit after stepping away.
Start
Open a todolist whose first item is to read the Principles section of the poteto-mode skill. Then add the phases below as todos.
Phase A: Frame
Ground first, then commit. Don't start the run until you can state:
- The definition of done as a falsifiable predicate (the prove-it-works principle skill).
- Scope, quantified: rough units and effort, plus the blockers grounding surfaced.
- The rigor level, biased high. One-way doors and high blast radius get more. Reversible low-stakes steps get less. Rigor is gates and artifacts, not "try harder".
Present the framing and tradeoffs before committing to a long run. Reversible work proceeds (the never-block-on-the-human principle skill), but a multi-hour run earns one checkpoint.
Phase B: Design the workflow
Decompose into atomic, independently-landable units. Sequence riskiest-unknown-first. Scaffold and verification come before features (the foundational-thinking principle skill).
- Build the verification harness before the work, with the baseline captured from the pre-change state, so the check reads as "old value vs new value".
- For one-way-door design decisions, run the architect skill (it runs arena). Skip it for mechanical work whose shape is already concrete. A second arena over a settled design is over-engineering (the laziness-protocol principle skill).
- Decide what fans out. Parallelize only across seams, and give each worker its own worktree or branch (the separate-before-serializing-shared-state principle skill). Don't over-fan.
- Write the designed phase list down. That list is what the human reviews.
Then execute the design. Add its steps to the todolist as concrete items, after the Phase C entry and before Phase D. Run each under the Phase C loop discipline, and weave the Phase D log through them, a row as each step lands, rather than saving the whole trail for the end.
Phase C: Run the loop
Each unit is an experiment. State the hypothesis, make the smallest change, measure against the predicate on the real artifact, keep it if it advanced, revert it if it didn't. Apply the sequence-verifiable-units principle skill, verifying each unit before starting the next instead of batching checks at the end.
- Verify by inspecting the artifact, never a self-report. When something passes too easily, suspect the observation method before the system.
- Pair delegated work with a judge. If a worker games the gate, reset and harden the contract. If the gate itself is wrong, fix the gate in its own change rather than routing around it.
- A verdict is VERIFIED, NOT VERIFIED, or INCONCLUSIVE. Inconclusive is not a pass. Don't hide a negative.
Phase D: Keep the audit trail
Log the run via the show-me-your-work skill. figure-it-out's work is usually ambitious enough to commit the trail so the reviewer can read it in the PR. The trail plus the diff is what lets the human come back and trust the work.
Phase E: Verify and hand back
Check the whole against the Phase A predicate on the real product, not just the harness. Encode any recurring correction as a gate, a lint rule, a check, or a script (the encode-lessons-in-structure principle skill).
Reply: the playbook you designed, the rigor level and why, the decision-trail path, what's verified against the predicate, and what's still open.
Latest changes
Initial reviewed release.
Version history
v1.0.0
Initial reviewed release.
File access pausedFile verification
- File integrity
No signed release verified for this version.
This checks published bytes, not safety, authorship, rights or assistant use.
Full compatibility
As stated by the author: Cursor
Included files
1 fileSKILL.md
markdownPublic file access is temporarily paused.
Use in your own tool
Save this resource and connect your assistant in the Use with flow before copying a test request.
Related resources
Teach Me This Code
Explains a body of work plainly by combining how-it-works and why-it-exists analysis into one clear explanation.
Cursor
- Rating
- Not rated
- Recorded downloads in the past 90 days
- 0
- Updated
- Nov 11
Principle: Explain the Number
Before trusting a measured number (speedup, latency, eval score), find what limits it and rule out mis-measurement.
Cursor
- Rating
- Not rated
- Recorded downloads in the past 90 days
- 0
- Updated
- Nov 11
Cypress E2E Testing Rules
Cypress end-to-end testing conventions: selectors, commands, fixtures, and flake prevention.
Cursor
- Rating
- Not rated
- Recorded downloads in the past 90 days
- 0
- Updated
- Nov 11